Monday, January 2, 2012

Saturday, 12/31/11 and Monday, 1/2/12:  Began installation of the flaperons. Cleco'd in place to establish the required 19 mm clearance seperation from wing. Drilled out for flaperon attachment splice plate. Mounted flaperons to wings, drilled out, flaperons are now in place. Began attaching flaperons to controls. Found the fuselage slot for the control rods must be widened & enlarged to accomodate full travel of the control rods. Had to adjust the control rod linkage to set the attachment eyebolts level with each other.  20 hrs.

Total Hrs. to date: 716



No comments:

Post a Comment