Tuesday, March 27, 2012



Sunday, 3/25/12 - Started on installation of brake lines.  Built radio rack braces. Riveted slats together. Braced off radio rack with L's. Secured brake lines in cabin with cable ties. Drilled out for brake line grommet thru fuse bottom. 8 hrs.

No comments:

Post a Comment