Sunday, April 29, 2012

Sunday, 4/29: Installed the middle-rear windows and riveted them in place along with the side upright channels. The channels are used as a raceway for the wiring and antennae cables that go to the wings and roof. I added "nutplates" to the center control tunnel top, which will allow me to access the tunnel for inspections later on. The plans do not call for these, but that's what's nice about experimental-class airplanes as you can add what you see fit. Danny added a stripe on the top of the rudder to accent the side stripe on the fuselage.

8 hrs, 883 total hrs. to date.



No comments:

Post a Comment